Build Instructions for: Snow Storm 1
by: RCTJ
File Format: RCT 2 (no expansions)
Ride Type: Twister Roller Coaster (RCT2)
Vehicle Type:
Operating Mode:
Track Segments (Total): 99
Segment Number Type
11Middle station (1)
21End station (1)
31Level to up [chain lift] (1 to 2)
41Left curve up [R2] (2 to 4)
51Launched lift hill (4 to 5)
61Launched lift hill (5 to 6)
71Launched lift hill (6 to 7)
81Slope up to sloped left bank (7 to 8)
91Banked left curve up [R2] (8 to 10)
101Left bank slope up to slope up (10 to 11)
111Launched lift hill (11 to 12)
121Up (12 to 13)
131Launched lift hill (13 to 14)
141Up to level (14)
151Level to down (14 to 13)
161Down to down steep (13 to 11)
171Steep downward twist left [R1] (11 to 7)
181Steep downward twist left [R1] (7 to 3)
191Down steep to down (3 to 1)
201Down to level (1)
211Level to up (1 to 2)
221Up (2 to 3)
231Up (3 to 4)
241Half loop, normal to inverted (4 to 13)
251Half-corkscrew left, inverted to normal (13 to 8)
261Half-corkscrew left, normal to inverted (8 to 13)
271Half loop, inverted to normal (13 to 3)
281Down to level (3)
291Level to up (3 to 4)
301Up (4 to 5)
311Vertical loop right (5 to 4)
321Slope down to sloped left bank (4 to 3)
331Banked left curve down [R2] (3 to 1)
341Left bank slope down to left bank (1)
351Left bank to left bank slope up (1 to 2)
361Banked left curve up [R3] (2 to 6)
371Banked left curve up [R2] (6 to 8)
381Left bank slope up to level (8)
39-413Brakes [22 mph = 38 km/hr] (8)
421Block brake (8)
431Level to right bank slope down (8 to 7)
441Banked right curve down [R3] (7 to 3)
451Banked right curve down [R2] (3 to 1)
461Right bank slope down to level (1)
47-482Level (1)
491Block brake (1)
501Right curve [R2] (1)
511Level to up (1 to 2)
521Launched lift hill (2 to 3)
531Launched lift hill (3 to 4)
541Launched lift hill (4 to 5)
551Slope up to sloped right bank (5 to 6)
561Banked right curve up [R2] (6 to 8)
571Right bank slope up to slope up (8 to 9)
581Launched lift hill (9 to 10)
591Launched lift hill (10 to 11)
601Slope up to sloped right bank (11 to 12)
611Banked right curve up [R2] (12 to 14)
621Right bank slope up to slope up (14 to 15)
631Launched lift hill (15 to 16)
641Up to level (16)
651Level to down (16 to 15)
661Down to down steep (15 to 13)
671Down steep to vertical (13 to 9)
681Vertical to down steep (9 to 6)
691Down steep to down (6 to 4)
701Down to level, roll right (4)
711Banked right curve [R2] (4)
721Roll right to right turn up [R2] (4 to 6)
731Up to level (6)
741Level to down (6 to 5)
751Down to down steep (5 to 3)
761Down steep to down (3 to 1)
771Down to level (1)
781Level to up (1 to 2)
791Up (2 to 3)
801Up (3 to 4)
811Slope up to sloped left bank (4 to 5)
821Banked left curve up [R2] (5 to 7)
831Left bank slope up to slope up (7 to 8)
841Vertical loop right (8 to 7)
851Down to down steep (7 to 5)
861Down steep to down (5 to 3)
871Down (3 to 2)
881Down (2 to 1)
891Down to level, roll left (1)
90-912Banked left curve [R2] (1)
921Roll left to level (1)
931Block brake (1)
941Level (1)
951Right curve [R2] (1)
961Block brake (1)
971Begin station (1)
98-992Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.