Build Instructions for: The Big Timer
by: mcktom9191
File Format: RCT 2 (no expansions)
Ride Type: Corkscrew Roller Coaster (RCT2)
Vehicle Type:
Operating Mode:
Track Segments (Total): 66
Segment Number Type
11Middle station (1)
21End station (1)
31Level (1)
41Level to up [chain lift] (1 to 2)
51Up [chain lift] (2 to 3)
61Up [chain lift] (3 to 4)
71Up to level [chain lift] (4)
81Level to down (4 to 3)
91Left curve down [R2] (3 to 1)
101Left curve down [R2] (1 to -1)
111Left curve down [R2] (-1 to -3)
121Left curve down [R2] (-3 to -5)
131Down to level (-5)
141Left curve [R2] (-5)
151Level (-5)
161Level to up (-5 to -4)
171Up [chain lift] (-4 to -3)
181Up [chain lift] (-3 to -2)
191Up [chain lift] (-2 to -1)
201Up to level [chain lift] (-1)
211Level to up [chain lift] (-1 to 0)
221Up [chain lift] (0 to 1)
231Up to level [chain lift] (1)
241Level to down (1 to 0)
251Left curve down [R2] (0 to -2)
261Left curve down [R2] (-2 to -4)
271Down to level (-4)
281Right curve [R2] (-4)
291Level (-4)
30-312Left curve [R2] (-4)
321Level (-4)
33-342Right curve [R2] (-4)
351Level (-4)
361On-ride photo section (-4)
371Right curve [R2] (-4)
381Level (-4)
391Level to up (-4 to -3)
401Vertical loop left (-3 to -4)
411Down to level (-4)
421Level to up (-4 to -3)
431Up (-3 to -2)
441Up (-2 to -1)
451Left curve up [R2] (-1 to 1)
461Up to level (1)
471Level to down (1 to 0)
481Left curve down [R2] (0 to -2)
491Right curve down [R2] (-2 to -4)
501Down to level (-4)
511Left curve [R2] (-4)
521Level to up (-4 to -3)
531Up (-3 to -2)
541Up (-2 to -1)
551Up (-1 to 0)
561Up (0 to 1)
571Up to level (1)
58-592Level (1)
601Left curve [R2] (1)
611Begin station (1)
62-665Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.