Build Instructions for: Alpine Adventures-Chairlift
by: Chris Sawyer
File Format: RCT 2 (no expansions)
Ride Type: Chairlift (RCT2)
Vehicle Type: (Ski-lift Chairs)
Operating Mode:
Track Segments (Total): 51
Segment Number Type
11Begin station (1)
21Middle station (1)
31End station (1)
41Level (1)
51Level to up (1 to 2)
61Up (2 to 3)
71Up (3 to 4)
81Up (4 to 5)
91Up (5 to 6)
101Up (6 to 7)
111Up (7 to 8)
121Up (8 to 9)
131Up (9 to 10)
141Up to level (10)
15-2511Level (10)
261Level to up (10 to 11)
271Up (11 to 12)
281Up (12 to 13)
291Up (13 to 14)
301Up (14 to 15)
311Up (15 to 16)
321Up (16 to 17)
331Up (17 to 18)
341Up (18 to 19)
351Up (19 to 20)
361Up (20 to 21)
371Up (21 to 22)
381Up to level (22)
39-402Level (22)
411Left curve [R1] (22)
421Level to up (22 to 23)
431Up (23 to 24)
441Up (24 to 25)
451Up to level (25)
46-483Level (25)
491Begin station (25)
501Middle station (25)
511End station (25)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.