Build Instructions for: Power Dragon
by: carlosrvm
File Format: RCT 2 (no expansions)
Ride Type: Air Powered Vertical Coaster (RCT2)
Vehicle Type:
Operating Mode:
Track Segments (Total): 210
Segment Number Type
11Middle station (1)
21End station (1)
3-108Level (1)
111Slope up to vertical (1 to 16)
121Vertical slope up (16 to 21)
131Vertical slope up (21 to 26)
141Vertical slope up (26 to 31)
151Vertical slope up (31 to 36)
161Vertical slope up (36 to 41)
171Vertical slope up (41 to 46)
181Vertical slope up (46 to 51)
191Vertical slope up (51 to 56)
201Vertical slope up (56 to 61)
211Vertical slope up (61 to 66)
221Vertical slope up (66 to 71)
231Vertical slope up (71 to 76)
241Vertical slope up (76 to 81)
251Vertical slope up (81 to 86)
261Top section (86 to 85)
271Vertical slope down (85 to 80)
281Vertical slope down (80 to 75)
291Vertical slope down (75 to 70)
301Vertical slope down (70 to 65)
311Vertical slope down (65 to 60)
321Vertical slope down (60 to 55)
331Vertical slope down (55 to 50)
341Vertical slope down (50 to 45)
351Vertical slope down (45 to 40)
361Vertical slope down (40 to 35)
371Vertical slope down (35 to 30)
381Vertical slope down (30 to 25)
391Vertical slope down (25 to 20)
401Vertical slope down (20 to 15)
411Slope to level (15 to 1)
42-498Level (1)
501Slope up to vertical (1 to 16)
511Vertical slope up (16 to 21)
521Vertical slope up (21 to 26)
531Vertical slope up (26 to 31)
541Vertical slope up (31 to 36)
551Vertical slope up (36 to 41)
561Vertical slope up (41 to 46)
571Vertical slope up (46 to 51)
581Vertical slope up (51 to 56)
591Vertical slope up (56 to 61)
601Vertical slope up (61 to 66)
611Vertical slope up (66 to 71)
621Top section (71 to 70)
631Vertical slope down (70 to 65)
641Vertical slope down (65 to 60)
651Vertical slope down (60 to 55)
661Vertical slope down (55 to 50)
671Vertical slope down (50 to 45)
681Vertical slope down (45 to 40)
691Vertical slope down (40 to 35)
701Vertical slope down (35 to 30)
711Vertical slope down (30 to 25)
721Vertical slope down (25 to 20)
731Vertical slope down (20 to 15)
741Slope to level (15 to 1)
75-8511Level (1)
861Slope up to vertical (1 to 16)
871Vertical slope up (16 to 21)
881Vertical slope up (21 to 26)
891Vertical slope up (26 to 31)
901Vertical slope up (31 to 36)
911Vertical slope up (36 to 41)
921Vertical slope up (41 to 46)
931Vertical slope up (46 to 51)
941Vertical slope up (51 to 56)
951Vertical slope up (56 to 61)
961Top section (61 to 60)
971Vertical slope down (60 to 55)
981Vertical slope down (55 to 50)
991Vertical slope down (50 to 45)
1001Vertical slope down (45 to 40)
1011Vertical slope down (40 to 35)
1021Vertical slope down (35 to 30)
1031Vertical slope down (30 to 25)
1041Vertical slope down (25 to 20)
1051Vertical slope down (20 to 15)
1061Slope to level (15 to 1)
107-1126Level (1)
1131Level to roll right (1)
1141Roll right (1)
1151Banked right curve [R3] (1)
116-1172Roll right (1)
1181Banked right curve [R3] (1)
1191Roll right (1)
1201Roll right to level (1)
121-1266Level (1)
1271Slope up to vertical (1 to 16)
1281Vertical slope up (16 to 21)
1291Vertical slope up (21 to 26)
1301Vertical slope up (26 to 31)
1311Vertical slope up (31 to 36)
1321Vertical slope up (36 to 41)
1331Vertical slope up (41 to 46)
1341Top section (46 to 45)
1351Vertical slope down (45 to 40)
1361Vertical slope down (40 to 35)
1371Vertical slope down (35 to 30)
1381Vertical slope down (30 to 25)
1391Vertical slope down (25 to 20)
1401Vertical slope down (20 to 15)
1411Slope to level (15 to 1)
142-15211Level (1)
1531Slope up to vertical (1 to 16)
1541Vertical slope up (16 to 21)
1551Vertical slope up (21 to 26)
1561Vertical slope up (26 to 31)
1571Vertical slope up (31 to 36)
1581Top section (36 to 35)
1591Vertical slope down (35 to 30)
1601Vertical slope down (30 to 25)
1611Vertical slope down (25 to 20)
1621Vertical slope down (20 to 15)
1631Slope to level (15 to 1)
164-1718Level (1)
1721Slope up to vertical (1 to 16)
1731Vertical slope up (16 to 21)
1741Vertical slope up (21 to 26)
1751Vertical slope up (26 to 31)
1761Top section (31 to 30)
1771Vertical slope down (30 to 25)
1781Vertical slope down (25 to 20)
1791Vertical slope down (20 to 15)
1801Slope to level (15 to 1)
181-19313Level (1)
194-1952Brakes [4 mph = 8 km/hr] (1)
196-1983Level (1)
1991Right curve [R3] (1)
200-2012Level (1)
2021Right curve [R3] (1)
203-2042Level (1)
2051Begin station (1)
206-2105Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.