Build Instructions for: TTChairlift 1
by: Frontier Developments
File Format: RCT 2 (no expansions)
Ride Type: Chairlift (RCT2)
Vehicle Type: (Chairlift Cars)
Operating Mode:
Track Segments (Total): 109
Segment Number Type
11Begin station (1)
2-32Middle station (1)
41End station (1)
51Level to up (1 to 2)
61Up (2 to 3)
71Up (3 to 4)
81Up (4 to 5)
91Up (5 to 6)
101Up (6 to 7)
111Up (7 to 8)
121Up to level (8)
131Level to down (8 to 7)
141Down (7 to 6)
151Down (6 to 5)
161Down (5 to 4)
171Down (4 to 3)
181Down (3 to 2)
191Down (2 to 1)
201Down (1 to 0)
211Down (0 to -1)
221Down (-1 to -2)
231Down (-2 to -3)
241Down (-3 to -4)
251Down (-4 to -5)
261Down (-5 to -6)
271Down (-6 to -7)
281Down (-7 to -8)
291Down (-8 to -9)
301Down (-9 to -10)
311Down to level (-10)
32-7039Level (-10)
711Level to up (-10 to -9)
721Up (-9 to -8)
731Up (-8 to -7)
741Up (-7 to -6)
751Up (-6 to -5)
761Up (-5 to -4)
771Up (-4 to -3)
781Up (-3 to -2)
791Up (-2 to -1)
801Up (-1 to 0)
811Up (0 to 1)
821Up (1 to 2)
831Up (2 to 3)
841Up (3 to 4)
851Up (4 to 5)
861Up (5 to 6)
871Up (6 to 7)
881Up (7 to 8)
891Up to level (8)
90-956Level (8)
961Level to down (8 to 7)
971Down (7 to 6)
981Down (6 to 5)
991Down (5 to 4)
1001Down (4 to 3)
1011Down (3 to 2)
1021Down (2 to 1)
1031Down to level (1)
104-1052Level (1)
1061Begin station (1)
107-1082Middle station (1)
1091End station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.