Build Instructions for: Torpedo - Gary W
by: iamgary11111
File Format: RCT 2 (no expansions)
Ride Type: Air Powered Vertical Coaster (RCT2)
Vehicle Type:
Operating Mode:
Track Segments (Total): 36
Segment Number Type
11Middle station (1)
21End station (1)
31Slope up to vertical (1 to 16)
41Vertical slope up (16 to 21)
51Vertical slope up (21 to 26)
61Vertical slope up (26 to 31)
71Vertical slope up (31 to 36)
81Vertical slope up (36 to 41)
91Vertical slope up (41 to 46)
101Top section (46 to 45)
111Vertical slope down (45 to 40)
121Vertical slope down (40 to 35)
131Vertical slope down (35 to 30)
141Vertical slope down (30 to 25)
151Slope to level (25 to 11)
161Brakes [50 mph = 84 km/hr] (11)
171Level to roll right (11)
18-192Banked right curve [R3] (11)
201Roll right to level (11)
211Slope up to vertical (11 to 26)
221Top section (26 to 25)
231Vertical slope down (25 to 20)
241Vertical slope down (20 to 15)
251Slope to level (15 to 1)
26-283Level (1)
29-302Brakes [32 mph = 53 km/hr] (1)
311Level to roll right (1)
32-332Banked right curve [R3] (1)
341Roll right to level (1)
351Begin station (1)
361Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.