Build Instructions for: Chairlift 2
by: Frontier Developments
File Format: RCT 2 (no expansions)
Ride Type: Chairlift (RCT2)
Vehicle Type: (Chairlift Cars)
Operating Mode:
Track Segments (Total): 84
Segment Number Type
11Begin station (1)
2-76Middle station (1)
81End station (1)
91Level (1)
101Level to up (1 to 2)
111Up (2 to 3)
121Up (3 to 4)
131Up (4 to 5)
141Up (5 to 6)
151Up to level (6)
161Level (6)
171Left curve [R1] (6)
18-192Level (6)
201Right curve [R1] (6)
21-6444Level (6)
651Level to down (6 to 5)
661Down (5 to 4)
671Down (4 to 3)
681Down (3 to 2)
691Down to level (2)
701Level (2)
711Right curve [R1] (2)
721Level to down (2 to 1)
731Down (1 to 0)
741Down (0 to -1)
751Down to level (-1)
761Level (-1)
771Begin station (-1)
78-836Middle station (-1)
841End station (-1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.