Build Instructions for: Rocketman
by: Nobak
File Format: RCT 2 (no expansions)
Ride Type: Mini Roller Coaster (RCT2)
Vehicle Type: (Rocket Cars)
Operating Mode:
Track Segments (Total): 132
Segment Number Type
11Middle station (1)
21End station (1)
31Left curve [R2] (1)
41Level to up [chain lift] (1 to 2)
51Up [chain lift] (2 to 3)
61Up [chain lift] (3 to 4)
71Up [chain lift] (4 to 5)
81Up to level [chain lift] (5)
91Left curve [R2] (5)
101Level to up [chain lift] (5 to 6)
111Up [chain lift] (6 to 7)
121Up [chain lift] (7 to 8)
131Up [chain lift] (8 to 9)
141Up [chain lift] (9 to 10)
151Up to level [chain lift] (10)
161Level to down (10 to 9)
171Slope down to sloped left bank (9 to 8)
181Banked left curve down [R3] (8 to 4)
191Left bank slope down to slope down (4 to 3)
201Down to down steep (3 to 1)
211Down steep (1 to -3)
221Down steep to down (-3 to -5)
231Down to level (-5)
241Level to up (-5 to -4)
251Up to up steep (-4 to -2)
261Steep upward twist left [R1] (-2 to 2)
271Up steep to up (2 to 4)
281Up (4 to 5)
291Up (5 to 6)
301Up to level (6)
311Level to left bank slope down (6 to 5)
321Banked left curve down [R2] (5 to 3)
331Left bank slope down to slope down (3 to 2)
341Down (2 to 1)
351Down to level (1)
361Level to left bank slope up (1 to 2)
371Banked left curve up [R2] (2 to 4)
381Left bank slope up to level (4)
391Level to left bank slope down (4 to 3)
401Banked left curve down [R2] (3 to 1)
411Left bank slope down to left bank (1)
421Helix down left [R2] (1 to 0)
431Roll left to slope up (0 to 1)
441Up (1 to 2)
451Up to level (2)
461Level to right bank slope down (2 to 1)
471Banked right curve down [R2] (1 to -1)
481Right bank slope down to level (-1)
491Level to up (-1 to 0)
501Up to level, roll right (0)
511Banked right curve [R2] (0)
521Roll right to slope up (0 to 1)
531Up to level (1)
541Level to down (1 to 0)
551Down (0 to -1)
561Down to level, roll right (-1)
571Banked right curve [R3] (-1)
581Roll right to level (-1)
591Ess bend right (-1)
601Level to roll right (-1)
611Banked right curve [R2] (-1)
621Roll right to level (-1)
631Level to up (-1 to 0)
641Up to level (0)
651Level to right bank slope down (0 to -1)
661Banked right curve down [R3] (-1 to -5)
671Right bank slope down to level (-5)
681Level to roll right (-5)
691Banked right curve [R2] (-5)
701Roll right to slope up (-5 to -4)
711Up (-4 to -3)
721Up (-3 to -2)
731Up to level (-2)
741Level (-2)
751Level to left bank slope down (-2 to -3)
761Banked left curve down [R2] (-3 to -5)
771Left bank slope down to left bank (-5)
781Banked left curve [R2] (-5)
791Roll left to slope up (-5 to -4)
801Up to level (-4)
811Level to down (-4 to -5)
821Down to level (-5)
831Level (-5)
841Level to roll left (-5)
851Helix up left [R2] (-5 to -4)
861Helix up left [R2] (-4 to -3)
871Banked left curve [R2] (-3)
881Roll left to level (-3)
89-902Level (-3)
911Level to roll left (-3)
921Banked left curve [R2] (-3)
931Roll left to slope down (-3 to -4)
941Down (-4 to -5)
951Down to level, roll right (-5)
96-972Banked right curve [R2] (-5)
981Banked right curve [R3] (-5)
991Roll right (-5)
1001Banked right curve [R2] (-5)
1011Roll right to level (-5)
102-1032Level (-5)
1041Level to roll right (-5)
1051Banked right curve [R2] (-5)
1061Roll right to level (-5)
1071Level to roll right (-5)
1081Banked right curve [R3] (-5)
1091Roll right to slope up (-5 to -4)
1101Up [chain lift] (-4 to -3)
1111Up to level [chain lift] (-3)
112-1132Level [chain lift] (-3)
1141Left curve [R2] (-3)
1151Level (-3)
1161Left curve [R2] (-3)
1171Level to up [chain lift] (-3 to -2)
1181Up [chain lift] (-2 to -1)
1191Up [chain lift] (-1 to 0)
1201Up [chain lift] (0 to 1)
1211Up to level [chain lift] (1)
1221Left curve [R2] (1)
1231Begin station (1)
124-1329Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.