Build Instructions for: Red Baron
by: Chris Sawyer
File Format: RCT 1 (no expansions)
Ride Type: Stand-Up Steel (RCT1)
Vehicle Type:
Operating Mode:
Track Segments (Total): 56
Segment Number Type
11Middle station (1)
21End station (1)
3-42Left curve [R2] (1)
51Level to up [chain lift] (1 to 2)
61Up [chain lift] (2 to 3)
71Up [chain lift] (3 to 4)
81Up [chain lift] (4 to 5)
91Up [chain lift] (5 to 6)
101Up [chain lift] (6 to 7)
111Up [chain lift] (7 to 8)
121Up [chain lift] (8 to 9)
131Up [chain lift] (9 to 10)
141Up [chain lift] (10 to 11)
151Up to level [chain lift] (11)
161Level to down (11 to 10)
171Down to level, roll right (10)
18-192Banked right curve [R2] (10)
201Roll right to slope down (10 to 9)
211Down to down steep (9 to 7)
221Down steep (7 to 3)
231Down steep to down (3 to 1)
241Down to level (1)
251Level to up (1 to 2)
261Vertical loop right (2 to 1)
271Down to level (1)
281Level to up (1 to 2)
291Vertical loop left (2 to 1)
301Down to level (1)
311Level to up (1 to 2)
321Up to up steep (2 to 4)
331Up steep to up (4 to 6)
341Up to level, roll right (6)
35-362Banked right curve [R3] (6)
371Roll right to slope down (6 to 5)
381Down (5 to 4)
391Down (4 to 3)
401Down (3 to 2)
411Down (2 to 1)
421Down to level (1)
431Half-corkscrew left, normal to inverted (1 to 6)
441Half-corkscrew right, inverted to normal (6 to 1)
451Half-corkscrew left, normal to inverted (1 to 6)
461Half-corkscrew right, inverted to normal (6 to 1)
471Level to roll right (1)
48-492Banked right curve [R3] (1)
501Roll right to level (1)
511Begin station (1)
52-565Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.