Build Instructions for: Steeplechase (Lane 2)
by: Chris Sawyer
File Format: RCT 1 (no expansions)
Ride Type: Single-Rail (RCT1)
Vehicle Type:
Operating Mode:
Track Segments (Total): 62
Segment Number Type
11Middle station (1)
21End station (1)
31Right curve [R2] (1)
41Level to up [chain lift] (1 to 2)
51Up [chain lift] (2 to 3)
61Up [chain lift] (3 to 4)
71Up [chain lift] (4 to 5)
81Up [chain lift] (5 to 6)
91Up to level [chain lift] (6)
101Left curve [R3] (6)
111Level to down (6 to 5)
121Down (5 to 4)
131Down to level (4)
141Left curve [R3] (4)
151Right curve [R2] (4)
16-172Left curve [R3] (4)
181Level to down (4 to 3)
191Down to level (3)
201Level (3)
211Ess bend left (3)
221Level to up [chain lift] (3 to 4)
231Up [chain lift] (4 to 5)
241Up [chain lift] (5 to 6)
251Up [chain lift] (6 to 7)
261Up to level [chain lift] (7)
271Level to down (7 to 6)
281Down (6 to 5)
291Down (5 to 4)
301Down to level (4)
311Level (4)
321Level to up (4 to 5)
331Up (5 to 6)
341Up to level (6)
351Level (6)
361Level to down (6 to 5)
371Down to level (5)
381Level to up (5 to 6)
391Up to level (6)
40-412Level (6)
421Level to down (6 to 5)
431Down (5 to 4)
441Down (4 to 3)
451Down to level (3)
46-472Right curve [R2] (3)
481Level to down (3 to 2)
491Down (2 to 1)
501Down to level (1)
511Level to up (1 to 2)
521Up (2 to 3)
531Up to level (3)
541Level to down (3 to 2)
551Down (2 to 1)
561Down to level (1)
571Ess bend right (1)
581Level (1)
591Begin station (1)
60-623Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.