Build Instructions for: Skyride
by: Chris Sawyer
File Format: RCT 1 (no expansions)
Ride Type: Chairlift (RCT1)
Vehicle Type:
Operating Mode:
Track Segments (Total): 164
Segment Number Type
11Begin station (1)
2-76Middle station (1)
81End station (1)
91Level to up (1 to 2)
101Up to level (2)
11-144Level (2)
151Level to up (2 to 3)
161Up (3 to 4)
171Up (4 to 5)
181Up (5 to 6)
191Up (6 to 7)
201Up (7 to 8)
211Up (8 to 9)
221Up (9 to 10)
231Up (10 to 11)
241Up to level (11)
25-4016Level (11)
411Right curve [R1] (11)
42-498Level (11)
501Left curve [R1] (11)
51-7323Level (11)
741Right curve [R1] (11)
75-828Level (11)
831Left curve [R1] (11)
84-874Level (11)
881Level to down (11 to 10)
891Down (10 to 9)
901Down (9 to 8)
911Down (8 to 7)
921Down to level (7)
93-942Level (7)
951Left curve [R1] (7)
961Begin station (7)
97-1026Middle station (7)
1031End station (7)
104-1118Level (7)
1121Level to up (7 to 8)
1131Up (8 to 9)
1141Up (9 to 10)
1151Up (10 to 11)
1161Up (11 to 12)
1171Up (12 to 13)
1181Up (13 to 14)
1191Up to level (14)
120-13415Level (14)
1351Level to down (14 to 13)
1361Down (13 to 12)
1371Down (12 to 11)
1381Down (11 to 10)
1391Down (10 to 9)
1401Down to level (9)
141-15313Level (9)
1541Level to down (9 to 8)
1551Down (8 to 7)
1561Down to level (7)
1571Begin station (7)
158-1636Middle station (7)
1641End station (7)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.