Build Instructions for: Jungle Horse
by: RCTJ
File Format: RCT 1 (no expansions)
Ride Type: Single-Rail (RCT1)
Vehicle Type:
Operating Mode:
Track Segments (Total): 41
Segment Number Type
11Middle station (1)
21End station (1)
31Right curve [R2] (1)
41Level to up [chain lift] (1 to 2)
51Up to level [chain lift] (2)
6-72Right curve [R2] (2)
81Level to up [chain lift] (2 to 3)
91Up [chain lift] (3 to 4)
101Up to level [chain lift] (4)
111Right curve [R2] (4)
121Right curve [R3] (4)
131Level to down (4 to 3)
141Down to level (3)
151Right curve [R3] (3)
161Level to down (3 to 2)
171Down to level (2)
181Right curve [R2] (2)
191Level to down (2 to 1)
201Down to level (1)
211Level to up (1 to 2)
221Up (2 to 3)
231Up to level (3)
241Right curve [R3] (3)
251Level to down (3 to 2)
261Down to level (2)
271Right curve [R2] (2)
281Level to down (2 to 1)
291Down to level (1)
30-334Level (1)
341Right curve [R3] (1)
35-362Level (1)
371Right curve [R3] (1)
381Ess bend left (1)
391Right curve [R2] (1)
401Begin station (1)
411Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.