| Build Instructions for: | Los Potrillos |
| by: | TJTycoon12 |
| File Format: | Added Attractions/Corkscrew Follies Compatible |
| Ride Type: | Steel Twister (AA) |
| Vehicle Type: | (3 1-car trains) |
| Operating Mode: | Continuous Circuit Mode |
| Track Segments (Total): | 24 |
| Segment | Number | Type |
| 1 | 1 | Middle station (1) |
| 2 | 1 | End station (1) |
| 3 | 1 | Level to up [chain lift] (1 to 2) |
| 4 | 1 | Up [chain lift] (2 to 3) |
| 5 | 1 | Up [chain lift] (3 to 4) |
| 6 | 1 | Up to level [chain lift] (4) |
| 7 | 1 | Level to down (4 to 3) |
| 8 | 1 | Down (3 to 2) |
| 9 | 1 | Down to level (2) |
| 10-11 | 2 | Left curve [R2] (2) |
| 12 | 1 | Level to up (2 to 3) |
| 13 | 1 | Up to level (3) |
| 14 | 1 | Level to down (3 to 2) |
| 15 | 1 | Down (2 to 1) |
| 16 | 1 | Down to level (1) |
| 17 | 1 | Level to up (1 to 2) |
| 18 | 1 | Up to level (2) |
| 19 | 1 | Level to down (2 to 1) |
| 20 | 1 | Down to level (1) |
| 21 | 1 | Level (1) |
| 22-23 | 2 | Left curve [R2] (1) |
| 24 | 1 | Begin station (1) |