Build Instructions for: Barf bags are 50 cents each
by: wackiworldzman943
File Format: RCT 2 (no expansions)
Ride Type: Twister Roller Coaster (RCT2)
Vehicle Type:
Operating Mode:
Track Segments (Total): 393
Segment Number Type
11Middle station (1)
21End station (1)
31Level to up [chain lift] (1 to 2)
41Launched lift hill (2 to 3)
51Launched lift hill (3 to 4)
61Launched lift hill (4 to 5)
71Launched lift hill (5 to 6)
81Launched lift hill (6 to 7)
91Launched lift hill (7 to 8)
101Launched lift hill (8 to 9)
111Launched lift hill (9 to 10)
121Launched lift hill (10 to 11)
131Launched lift hill (11 to 12)
141Launched lift hill (12 to 13)
151Launched lift hill (13 to 14)
161Launched lift hill (14 to 15)
171Launched lift hill (15 to 16)
181Launched lift hill (16 to 17)
191Launched lift hill (17 to 18)
201Launched lift hill (18 to 19)
211Launched lift hill (19 to 20)
221Launched lift hill (20 to 21)
231Launched lift hill (21 to 22)
241Launched lift hill (22 to 23)
251Launched lift hill (23 to 24)
261Launched lift hill (24 to 25)
271Launched lift hill (25 to 26)
281Launched lift hill (26 to 27)
291Launched lift hill (27 to 28)
301Launched lift hill (28 to 29)
311Launched lift hill (29 to 30)
321Launched lift hill (30 to 31)
331Launched lift hill (31 to 32)
341Launched lift hill (32 to 33)
351Launched lift hill (33 to 34)
361Launched lift hill (34 to 35)
371Launched lift hill (35 to 36)
381Launched lift hill (36 to 37)
391Launched lift hill (37 to 38)
401Launched lift hill (38 to 39)
411Launched lift hill (39 to 40)
421Up to level (40)
431Parabolic level to down steep (40 to 34)
441Down steep to vertical (34 to 30)
451Vertical slope down (30 to 28)
461Vertical slope down (28 to 26)
471Vertical slope down (26 to 24)
481Vertical slope down (24 to 22)
491Vertical slope down (22 to 20)
501Vertical slope down (20 to 18)
511Vertical slope down (18 to 16)
521Vertical slope down (16 to 14)
531Vertical slope down (14 to 12)
541Vertical slope down (12 to 10)
551Vertical slope down (10 to 8)
561Vertical to down steep (8 to 5)
571Down steep to down (5 to 3)
581Down (3 to 2)
591Down (2 to 1)
601Down to level (1)
611Parabolic level to up steep (1 to 7)
621Up steep to vertical (7 to 10)
631Vertical slope up (10 to 12)
641Vertical slope up (12 to 14)
651Vertical slope up (14 to 16)
661Vertical slope up (16 to 18)
671Vertical slope up (18 to 20)
681Vertical slope up (20 to 22)
691Vertical slope up (22 to 24)
701Vertical slope up (24 to 26)
711Vertical slope up (26 to 28)
721Vertical slope up (28 to 30)
731Quarter loop up (30 to 38)
741Quarter loop down (38 to 29)
751Vertical to down steep (29 to 26)
761Steep downward twist left [R1] (26 to 22)
771Down steep (22 to 18)
781Down steep (18 to 14)
791Down steep (14 to 10)
801Down steep (10 to 6)
811Down steep to down (6 to 4)
821Down (4 to 3)
831Down (3 to 2)
841Down (2 to 1)
851Down to level (1)
861Level to up (1 to 2)
871Large half loop right, normal to inverted (2 to 19)
881Half-corkscrew right, inverted to normal (19 to 14)
891Half-corkscrew right, normal to inverted (14 to 19)
901Quarter loop down (19 to 10)
911Vertical to down steep (10 to 7)
921Parabolic down steep to level (7 to 2)
931Level to right bank slope up (2 to 3)
941Banked right curve up [R3] (3 to 7)
951Right bank slope up to right bank (7)
961Right bank to right bank slope down (7 to 6)
971Banked right curve down [R3] (6 to 2)
981Right bank slope down to slope down (2 to 1)
991Down to level (1)
1001Level to roll right (1)
101-1022Banked right curve [R2] (1)
1031Roll right to level (1)
1041Level to up (1 to 2)
1051Up to up steep (2 to 4)
1061Up steep (4 to 8)
1071Up steep (8 to 12)
1081Up steep to up (12 to 14)
1091Up to level (14)
1101Parabolic level to down steep (14 to 8)
1111Parabolic down steep to level (8 to 3)
112-1132Right curve [R2] (3)
1141Left curve [R2] (3)
1151Right curve [R2] (3)
1161Left curve [R2] (3)
1171Right curve [R2] (3)
1181Left curve [R2] (3)
1191Right curve [R2] (3)
1201Left curve [R2] (3)
1211Right curve [R2] (3)
1221Level to up (3 to 4)
1231Launched lift hill (4 to 5)
1241Launched lift hill (5 to 6)
1251Launched lift hill (6 to 7)
1261Launched lift hill (7 to 8)
1271Launched lift hill (8 to 9)
1281Launched lift hill (9 to 10)
1291Launched lift hill (10 to 11)
1301Launched lift hill (11 to 12)
1311Launched lift hill (12 to 13)
1321Launched lift hill (13 to 14)
1331Launched lift hill (14 to 15)
1341Launched lift hill (15 to 16)
1351Launched lift hill (16 to 17)
1361Launched lift hill (17 to 18)
1371Launched lift hill (18 to 19)
1381Launched lift hill (19 to 20)
1391Launched lift hill (20 to 21)
1401Launched lift hill (21 to 22)
1411Launched lift hill (22 to 23)
1421Launched lift hill (23 to 24)
1431Launched lift hill (24 to 25)
1441Launched lift hill (25 to 26)
1451Launched lift hill (26 to 27)
1461Launched lift hill (27 to 28)
1471Launched lift hill (28 to 29)
1481Launched lift hill (29 to 30)
1491Launched lift hill (30 to 31)
1501Launched lift hill (31 to 32)
1511Launched lift hill (32 to 33)
1521Launched lift hill (33 to 34)
1531Launched lift hill (34 to 35)
1541Launched lift hill (35 to 36)
1551Launched lift hill (36 to 37)
1561Up to level, roll right (37)
1571Helix down right [R3] (37 to 36)
1581Roll right to slope down (36 to 35)
1591Down to down steep (35 to 33)
1601Down steep to vertical (33 to 29)
1611Vertical twist down right (29 to 23)
1621Vertical twist down right (23 to 17)
1631Vertical twist down right (17 to 11)
1641Vertical to down steep (11 to 8)
1651Down steep (8 to 4)
1661Down steep to down (4 to 2)
1671Down (2 to 1)
1681Down to level (1)
1691Level to up (1 to 2)
1701Large half loop right, normal to inverted (2 to 19)
1711Barrel roll right, inverted to normal (19 to 17)
1721Level to roll right (17)
173-1742Banked right curve [R3] (17)
1751Roll right to level (17)
1761Barrel roll left, normal to inverted (17 to 19)
1771Large half loop right, inverted to normal (19 to 1)
1781Down to level (1)
1791Level to up (1 to 2)
1801Up to up steep (2 to 4)
1811Up steep to vertical (4 to 7)
1821Vertical to up steep (7 to 11)
1831Parabolic up steep to level (11 to 16)
1841Parabolic level to down steep (16 to 10)
1851Down steep (10 to 6)
1861Parabolic down steep to level (6 to 1)
1871Level to roll right (1)
188-1903Banked right curve [R4] (1)
1911Roll right to up [diag] (1 to 2)
1921Up to roll right [diag] (2)
193-1953Banked right curve [R4] (2)
1961Roll right to slope up (2 to 3)
1971Slope up to sloped right bank (3 to 4)
1981Banked right curve up [R3] (4 to 8)
1991Right bank slope up to slope up (8 to 9)
2001Launched lift hill (9 to 10)
2011Launched lift hill (10 to 11)
2021Launched lift hill (11 to 12)
2031Launched lift hill (12 to 13)
2041Launched lift hill (13 to 14)
2051Launched lift hill (14 to 15)
2061Launched lift hill (15 to 16)
2071Launched lift hill (16 to 17)
2081Launched lift hill (17 to 18)
2091Launched lift hill (18 to 19)
2101Launched lift hill (19 to 20)
2111Launched lift hill (20 to 21)
2121Launched lift hill (21 to 22)
2131Launched lift hill (22 to 23)
2141Launched lift hill (23 to 24)
2151Launched lift hill (24 to 25)
2161Up to level (25)
2171Level to down (25 to 24)
2181Down to down steep (24 to 22)
2191Down steep (22 to 18)
2201Down steep (18 to 14)
2211Down steep (14 to 10)
2221Down steep (10 to 6)
2231Down steep to down (6 to 4)
2241Down (4 to 3)
2251Down (3 to 2)
2261Down (2 to 1)
2271Down to level (1)
228-2292Left curve [R2] (1)
230-2312Right curve [R2] (1)
232-2332Left curve [R2] (1)
234-2352Right curve [R2] (1)
236-2372Left curve [R2] (1)
238-2392Right curve [R2] (1)
240-2412Left curve [R2] (1)
242-2432Right curve [R2] (1)
2441Left curve [R2] (1)
2451Level to up (1 to 2)
2461Half loop, normal to inverted (2 to 11)
2471Barrel roll right, inverted to normal (11 to 9)
2481Level to up (9 to 10)
2491Launched lift hill (10 to 11)
2501Launched lift hill (11 to 12)
2511Launched lift hill (12 to 13)
2521Launched lift hill (13 to 14)
2531Launched lift hill (14 to 15)
2541Launched lift hill (15 to 16)
2551Launched lift hill (16 to 17)
2561Launched lift hill (17 to 18)
2571Launched lift hill (18 to 19)
2581Launched lift hill (19 to 20)
2591Launched lift hill (20 to 21)
2601Launched lift hill (21 to 22)
2611Launched lift hill (22 to 23)
2621Launched lift hill (23 to 24)
2631Launched lift hill (24 to 25)
2641Launched lift hill (25 to 26)
2651Launched lift hill (26 to 27)
2661Launched lift hill (27 to 28)
2671Launched lift hill (28 to 29)
2681Launched lift hill (29 to 30)
2691Launched lift hill (30 to 31)
2701Launched lift hill (31 to 32)
2711Launched lift hill (32 to 33)
2721Launched lift hill (33 to 34)
2731Launched lift hill (34 to 35)
2741Launched lift hill (35 to 36)
2751Launched lift hill (36 to 37)
2761Launched lift hill (37 to 38)
2771Launched lift hill (38 to 39)
2781Launched lift hill (39 to 40)
2791Up to level (40)
2801Parabolic level to down steep (40 to 34)
2811Down steep to vertical (34 to 30)
2821Vertical slope down (30 to 28)
2831Vertical slope down (28 to 26)
2841Vertical slope down (26 to 24)
2851Vertical slope down (24 to 22)
2861Vertical slope down (22 to 20)
2871Vertical slope down (20 to 18)
2881Vertical twist down right (18 to 12)
2891Vertical to down steep (12 to 9)
2901Down steep (9 to 5)
2911Down steep to down (5 to 3)
2921Down (3 to 2)
2931Down (2 to 1)
2941Down to level (1)
2951Level to up (1 to 2)
2961Large half loop right, normal to inverted (2 to 19)
2971Barrel roll right, inverted to normal (19 to 17)
2981Level to left bank slope down (17 to 16)
2991Banked left curve down [R3] (16 to 12)
3001Banked left curve down [R3] (12 to 8)
3011Left bank slope down to left bank (8)
3021Left bank to left bank slope up (8 to 9)
3031Left bank slope up to level (9)
3041Level to roll right (9)
3051Helix down right [R3] (9 to 8)
3061Helix down right [R3] (8 to 7)
3071Helix down right [R3] (7 to 6)
3081Helix down right [R3] (6 to 5)
3091Helix down right [R3] (5 to 4)
3101Helix down right [R3] (4 to 3)
3111Helix down right [R3] (3 to 2)
3121Helix down right [R3] (2 to 1)
3131Roll right to level (1)
3141Level to roll right (1)
315-3162Banked right curve [R4] (1)
3171Roll right to slope up (1 to 2)
3181Up to up steep (2 to 4)
3191Up steep to vertical (4 to 7)
3201Vertical slope up (7 to 9)
3211Vertical slope up (9 to 11)
3221Quarter loop up (11 to 19)
3231Half-corkscrew right, inverted to normal (19 to 14)
3241Parabolic level to down steep (14 to 8)
3251Down steep to down (8 to 6)
3261Slope down to sloped right bank (6 to 5)
3271Banked right curve down [R2] (5 to 3)
3281Banked right curve down [R2] (3 to 1)
3291Right bank slope down to level (1)
3301Left curve [R3] (1)
331-34010Level (1)
3411Level to up (1 to 2)
3421Launched lift hill (2 to 3)
3431Launched lift hill (3 to 4)
3441Launched lift hill (4 to 5)
3451Launched lift hill (5 to 6)
3461Launched lift hill (6 to 7)
3471Launched lift hill (7 to 8)
3481Launched lift hill (8 to 9)
3491Launched lift hill (9 to 10)
3501Launched lift hill (10 to 11)
3511Launched lift hill (11 to 12)
3521Launched lift hill (12 to 13)
3531Launched lift hill (13 to 14)
3541Launched lift hill (14 to 15)
3551Launched lift hill (15 to 16)
3561Launched lift hill (16 to 17)
3571Launched lift hill (17 to 18)
3581Launched lift hill (18 to 19)
3591Launched lift hill (19 to 20)
3601Up to level (20)
3611Parabolic level to down steep (20 to 14)
3621Down steep (14 to 10)
3631Down steep (10 to 6)
3641Parabolic down steep to level (6 to 1)
3651Level to roll right (1)
366-3672Banked right curve [R2] (1)
3681Roll right to level (1)
3691Level to roll left (1)
3701Banked left curve [R3] (1)
3711Roll left to level (1)
372-38312Level (1)
384-3852Left curve [R4] (1)
3861Level (1)
387-3882Left curve [R4] (1)
389-3902Level (1)
3911Begin station (1)
392-3932Middle station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.