Build Instructions for: Ice Flow
by: Chris Sawyer
File Format: RCT 2 (no expansions)
Ride Type: Dinghy Slide (RCT2)
Vehicle Type:
Operating Mode:
Track Segments (Total): 62
Segment Number Type
11Middle station (1)
21End station (1)
3-42Left curve [R2] (1)
51Level to up [chain lift] (1 to 2)
61Up [chain lift] (2 to 3)
71Up [chain lift] (3 to 4)
81Up [chain lift] (4 to 5)
91Up [chain lift] (5 to 6)
101Up [chain lift] (6 to 7)
111Up [chain lift] (7 to 8)
121Up [chain lift] (8 to 9)
131Up [chain lift] (9 to 10)
141Up [chain lift] (10 to 11)
151Up [chain lift] (11 to 12)
161Up to level [chain lift] (12)
171Begin station (12)
181Middle station (12)
191End station (12)
201Level to down (12 to 11)
211Down to level (11)
22-232Left curve [R2], covered (11)
241Level to down (11 to 10)
251Down, covered (10 to 9)
261Down to level (9)
27-293Left curve [R3] (9)
301Level to down (9 to 8)
311Down (8 to 7)
321Down to level (7)
331Left curve [R3] (7)
34-352Left curve [R3], covered (7)
361Level to down, covered (7 to 6)
371Down to down steep, covered (6 to 4)
381Down steep to down (4 to 2)
391Down to level (2)
40-423Left curve [R3] (2)
431Right curve [R3] (2)
441Level to up (2 to 3)
451Up to level, covered (3)
461Level, covered (3)
471Level (3)
48-492Level, covered (3)
501Left curve [R2] (3)
511Left curve [R2], covered (3)
521Level to down, covered (3 to 2)
531Down, covered (2 to 1)
541Down to level, covered (1)
551Left curve [R2], covered (1)
561Ess bend left, covered (1)
571Left curve [R2], covered (1)
581Ess bend left, covered (1)
59-613Level (1)
621Begin station (1)
This file was created in the RCTspace.com Ride Exchange for RCT1 and RCT2 Rides © rcthelp 2003 to the present.
Not to be reproduced without expressed permission.
With thanks to Greg Wolking for permission to use his RCT Track Decoder program.